Skip to main content
615 Sewer, sewer company in Nashville TN 615-431-3789

New Installation & Connections

New construction sewer hookups timed to the build and ready for inspection

We install the underground sewer for new homes and buildings before the slab, with stubs, cleanouts and connection to the main.

Call or text today615-431-3789

Request a site visit

Tell us about your project. We will contact you to confirm the details and set up a time to visit.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

New Construction Sewer Hookups

On a new build, the sewer goes in early and has to be right, because it will be buried under a slab and a yard. Builders and owners rely on us to install the underground system on time, to the plan and ready for inspection, so framing and concrete are not delayed.

We review the plans, locate the stub points, set the grade and install the laterals, stub-outs and cleanouts. We connect to the main or the septic system as the plan requires and coordinate the underground inspections. We protect stubs during backfill, record their locations and help you avoid having to open the ground again.

What you get

Done right, from the first walk-through

01

Plan review

Fixture locations, stub points and grade confirmed against the plans.

02

Underground sewer

Laterals, stub-outs and cleanouts installed before the slab.

03

Inspection coordination

Rough-in and underground inspections scheduled and passed.

04

Protected stubs

Stubs capped, marked and recorded before backfill and concrete.

The process

How your service comes together

  1. 1

    Review and stake

    We review plans and set the layout.

  2. 2

    Install underground

    We install the sewer and stubs to the plan and grade.

  3. 3

    Inspect and protect

    We pass inspection and protect the stubs through backfill.

FAQ

Common questions about new construction hookups

When should the sewer go in?

Before the slab or foundation work that covers it. We coordinate the schedule with your builder.

Can you work with my plumber?

Yes. We coordinate stub locations and elevations with the plumber.

What if the plans change?

Tell us early. Moving a stub after the slab is far harder than before.

Let us help with your new construction hookups

Call, text or send the form. Tell us about the property, what the drains are doing and when it started, and we will take it from there.

615-431-3789Text